Overall Equipment Effectiveness: how to measure it and improve it.

Real case

A Swedish battery factory measured by hand, for 17 days in 2023, the OEE of its stacking stage: it was 14%, against the 85% world-class benchmark (another Swedish thesis found between 43 and 50% in established plants). The main loss was availability, and it did not come from equipment failures but from how the work around the equipment was organized.

Source: Thesis, Uppsala University (Sweden). See the article