Skip to content
LKaizeN

How many cycles should you time?

Enter the task's cycle time and get the number of cycles recommended by the General Electric guide.

Cycles to time (guide)

60

This is the approximate General Electric guide reproduced by Niebel and Freivalds (table 10.2). The shorter the cycle, the more repetitions are needed for the average to be reliable. With the real scatter of your readings you can refine it with statistics, but this table is enough to get started.

How it works

You enter the task's cycle time and the tool returns how many cycles it is advisable to time, according to the approximate General Electric guide reproduced by Niebel and Freivalds (table 10.2):

Cycle time (min)Cycles to observe
up to 0.10200
up to 0.25100
up to 0.5060
up to 0.7540
up to 130
up to 220
up to 515
up to 1010
up to 208
up to 405
more than 403

It is a guide and not a rule: the book notes that a more exact number can be calculated with statistics from the average and the standard deviation of the readings, but that for economic reasons the analyst does not rely on that alone. The recording methods (continuous and snapback) and the control of the recording error (below 2%) are covered in the article. The observation sheet in Excel already includes both methods and these calculations.

Sources

These are the ones from the article where the theory behind this tool is developed.

Continuous or snapback method? It is in the article Stopwatch time study.