The mudas: the 7 (or 8) wastes of Lean
Muda is the Japanese word for waste: any expense that does not help produce value. Learning to see it is the first step of Lean, and the list has seven classic wastes plus an eighth that several authors add.
- Reading time
- 8 minutes
- Sources
- 2 papers, 1 book
- Tool
- Reading only
In one line
Muda is any expense that adds no value to the product or service from the customer's point of view, and Lean starts by learning to see it.
What it is
Meyers and Stephens define muda (waste) as any expense that does not help produce value, and they propose starting by asking "why" five times about any problem or cost, to get to the original cause (this is the 5 Whys technique). Niebel and Freivalds point out that the seven types popularized by Shingo closely resemble what industrial engineering was already analyzing with process charts and motion study: delays and transports are detected in a flow process chart, and unnecessary motions sum up the work of the Gilbreths.
The seven classic mudas
The Universidad Icesi paper, which follows Ohno, defines them as follows:
| Muda | What it is |
|---|---|
| Overproduction | Producing items the customer did not order: it increases inventory and its storage costs, the risk of obsolescence and the space taken up |
| Waiting | The operator waits for a part to finish processing or for a station or tool to become available |
| Transportation | Moving a product from one place to another unnecessarily, including intermediate moves; it wastes time and adds risks for people and cargo |
| Overprocessing | Putting too much into a product: doing things the customer does not notice |
| Inventory | Excess anywhere in the process: storage costs, longer lead times and damaged products; it can also hide a quality problem until the good stock is used up |
| Unnecessary motion | Employee movements, typically caused by disorder or poor sorting |
| Defects or rework | Product that has to be repaired or scrapped |
The eighth, and its cousins
Meyers and Stephens speak of eight classes (they add "poor use of personnel"), and the Ciudad Juárez paper also lists eight wastes: defects, overprocessing, inventories, waiting, motions, transports, overproduction and human talent. That same paper distinguishes two other Japanese words: mura is changes in production planning, and muri is poor manufacturing designs that fail to meet ergonomic requirements and wear people down.
Real example
The Ciudad Juárez case shows waiting in numbers. On a gear-and-chain assembly line, the takt time was 6 seconds, but stations 10 and 20 took more than 7 seconds and stations 30 and 40 less than 5. Every part waited at the slow stations and the operators at the fast ones ended up with idle time: pure waiting, caused by an uneven distribution of work (the first stations assembled 5 components, the last ones only 2). In the test of that cause, rebalancing the line brought the measured lead time down from 26.07 to 20.73 seconds. The full case is in the Lean Six Sigma article.
How to use it
- Walk through the real process (not the one on paper) with the list of mudas in hand.
- Note each waste with its location, its frequency and its estimated cost.
- Attack first the one that costs the most or repeats the most, with the right tool (5S for disorder, spaghetti diagram for transport and motion, SMED for waiting caused by changeovers, poka-yoke for defects).
Benefits
- It provides a common language: the whole team names the wastes the same way.
- It ties loose techniques (5S, SMED, poka-yoke) to a common goal.
Limitations to keep in mind
- The lists vary between authors (seven, eight, with different names): what matters is the way of looking, not memorizing the number.
- Eliminating one muda can move the problem to another if you do not look at the whole system; for example, reducing inventory without cutting changeover times just creates waiting.
In summary
The mudas are the list of things about which you have to ask yourself, "Would the customer pay for this?" They are the starting point of Lean and of the Toyota Production System.
More on Continuous Improvement and Lean
Gemba and Genchi Genbutsu: going to see where things happen
Gemba is the place where value is created and problems show up. Genchi Genbutsu is the Toyota principle of going to see it with your own eyes before deciding. A walk through the Gemba, with questions and respect, is a Kaizen tool.
Heijunka: production leveling
Customer orders go up and down, but a factory performs better at an even pace. Heijunka takes the order volume for a period and spreads it out as the same quantity and the same product mix every day.
Jidoka and Andon: stop the line when something goes wrong
Jidoka is the second pillar of the Toyota system: giving machines and people the ability to detect a defect and stop, so they do not keep producing errors. Andon is the light board that signals what is happening and where.