Takt time calculator

Enter the available time, the demand and the measured cycle time of your process: it tells you the pace you need and whether your process meets it.

Takt time

0.80 min/unit

Measured cycle time

0.90 min/unit

The cycle is LONGER than the takt: you will not meet the demand. You need to reduce the cycle time (improve the method, the layout, add a shift) or add capacity (more machines, more people).

How it works

You enter the available time, the customer demand and the cycle time you measure in your process.

The 2% margin is a tolerance of this site so as not to compare decimal numbers for exact equality. Use the same unit of time for the available time and the cycle, and subtract planned stoppages from the available time.

If you prefer to work in Excel, there is a takt time and capacity per workstation spreadsheet in Excel with these same calculations.